Stan & Sue Creitz Observatory (SSCO) Journal


Pods at Creitz Observatory

3/23/2023 – The first two initial pads were poured the middle of March 2023. This image shows the first two SkyShed Pods™ in position. Unfortunately, the pads were poorly done and we had to needlessly wait more than a month on the contractor, before just attempting a fix the first of May.


5/03/2023 – This series of images show the fixed pads with the pods anchored and in place. The pads are painted with an attractive concrete paint. The doors to the pods are now facing north and the position is permanent. The bottoms are sealed now with an industrial grade adhesive/sealant to keep water out. More modifications to come…